Larry
LARRY
Manager console
Manager
TodayInboxPulseProjectsHR ProcessesNeeds ReviewActivity1KnowledgeAutomation
Operations
Incidents1LeaveOnboardingStaffChatsInventoryEvents
System
How Larry worksMerge queueSkillsTasksSettings
Larry is active
Next pulse at 4:00 PM
Chats24 conversations · 293 in · 464 out · 11 today
RC
Conversations
24
Inbound
293
DMs received
Outbound
464
Larry's replies
Messages today
11
last 24h
Recent messages
Newest first · across all chats
Last 8 of 757
  • Larry →Rohan Callander4h ago

    Morning brief — 10 June Projects: - 3 due today (ACC incident, factory structure review, disciplinary investigation, tool allowance setup) - 3 due this week (coffee shout, workflow review, performance coaching) - All 7 awaiting manager/Roh…

  • Larry →Rohan Callander4h ago

    Morning brief — 10 Jun 2026 Projects: • 3 overdue (acc incident, factory structure, disciplinary investigation) — waiting on Rohan/Ben for closure • 5 due this week (tool allowance setup, coffee shout, workflow review, performance coaching…

  • Mark Bidlake →SRJMark Bidlake19h ago

    Sounds good. . Lets do for BWJ to start with for a Speed Sander

  • Larry →Mark Bidlake19h ago

    Hey Mark — yes, I can build that. I can't create a native Google Sheet directly through my tools, but I can upload an .xlsx file to Drive which you open and convert to Google Sheets in one click (File → Save as Google Sheets). For a joiner…

People
24 · newest first
  • RC
    Rohan Callander
    110 in · 188 out·4h ago
  • MB
    Mark BidlakeSRJ
    23 in · 31 out·19h ago
  • ?
    U0B8PG9BTB9
    1 in · 1 out·1d ago
Mark Bidlake →SRJMark Bidlake19h ago

are you able to build me a template for SOPs in a Google sheet

  • Larry →Mark Bidlake19h ago

    Got the file Mark, but I can't extract text from .docx directly — my tools don't parse Word files natively. Two options: 1. *Convert and resend* — if you can save it as a PDF and send that through, I'll read the structure and populate a Sp…

  • Mark Bidlake →SRJMark Bidlake19h ago

    try this as your template

  • Larry →Mark Bidlake19h ago

    test

  • AS
    Andy StanningSRJ
    4 in · 11 out·3d ago
  • DC
    Dan CooperBWJ
    8 in · 20 out·4d ago
  • BK
    Ben KnightBWJ
    44 in · 67 out·5d ago
  • CH
    Craig HeuvelBWJ
    5 in · 7 out·6d ago
  • CZ
    Cornelia ZlamalaBWJ
    11 in · 13 out·6d ago
  • HS
    Harry StevensSRJ
    4 in · 8 out·7d ago
  • TA
    Tomas AmadeoBWJ
    18 in · 21 out·7d ago
  • JG
    Jemma GambleSRJ
    25 in · 34 out·7d ago
  • CS
    Cody ScottBWJ
    3 in · 6 out·8d ago
  • JP
    Jessica PowersBWJ
    7 in · 9 out·8d ago
  • AT
    Anna ThomasSRJ
    17 in · 23 out·12d ago
  • NN
    Nhan NguyenSRJ
    2 in · 5 out·14d ago
  • CP
    Craig PengellySRJ
    6 in · 8 out·27d ago
  • MS
    Margarette SellersSRJ
    3 in · 4 out·28d ago
  • PP
    Peter PanovBWJ
    0 in · 1 out·29d ago
  • LA
    Lance AdamsSRJ
    0 in · 2 out·29d ago
  • TO
    Tim O'DonnellBWJ
    0 in · 1 out·8/05/2026
  • SG
    Sam GaskinBWJ
    0 in · 1 out·8/05/2026
  • ?
    U0B0LKT9TLZ
    1 in · 1 out·28/04/2026
  • ?
    U0ARFRJ6CUS
    0 in · 1 out·23/04/2026
  • ?
    U0AV884K33J
    1 in · 1 out·22/04/2026
  • All messages
    Full feed
    30 most recent · click a person on the left to drill in
    • Larry →Rohan Callander4h ago

      Morning brief — 10 June Projects: - 3 due today (ACC incident, factory structure review, disciplinary investigation, tool allowance setup) - 3 due this week (coffee shout, workflow review, performance coaching) - All 7 awaiting manager/Roh…

    • Larry →Rohan Callander4h ago

      Morning brief — 10 Jun 2026 Projects: • 3 overdue (acc incident, factory structure, disciplinary investigation) — waiting on Rohan/Ben for closure • 5 due this week (tool allowance setup, coffee shout, workflow review, performance coaching…

    • Mark Bidlake →SRJMark Bidlake19h ago

      Sounds good. . Lets do for BWJ to start with for a Speed Sander

    • Larry →Mark Bidlake19h ago

      Hey Mark — yes, I can build that. I can't create a native Google Sheet directly through my tools, but I can upload an .xlsx file to Drive which you open and convert to Google Sheets in one click (File → Save as Google Sheets). For a joiner…

    • Mark Bidlake →SRJMark Bidlake19h ago

      are you able to build me a template for SOPs in a Google sheet

    • Larry →Mark Bidlake19h ago

      Got the file Mark, but I can't extract text from .docx directly — my tools don't parse Word files natively. Two options: 1. *Convert and resend* — if you can save it as a PDF and send that through, I'll read the structure and populate a Sp…

    • Mark Bidlake →SRJMark Bidlake19h ago

      try this as your template

    • Larry →Mark Bidlake19h ago

      test

    • Mark Bidlake →SRJMark Bidlake20h ago

      can you copy and use the BWJ stoke sander SOP as a template use take this info above to populate that sheet under a speed sander header,

    • Larry →Mark Bidlake20h ago

      Hey Mark — here's a set of SOP bullet points for a joinery speed sander. These are structured to cover the standard sections you'd expect in a workshop SOP: --- *Speed Sander (Wide Belt / Drum Sander) — SOP Bullet Points* *Purpose* • To…

    • Mark Bidlake →SRJMark Bidlake20h ago

      Hi Larry Can you please email me a list of bullet points for a Joinery industry speed sander machine to populate an SOP

    • Larry →U0B8PG9BTB91d ago

      G'day Mark — welcome to Slack! Happy to have you on board. Give me a shout if you need anything, and I'm here to help keep the admin ticking over.

    • U0B8PG9BTB9 →U0B8PG9BTB91d ago

      Mark has joined Slack – take a second to say hello.

    • Larry →Rohan Callander1d ago

      Morning brief — 9 Jun 2026 Projects: - 1 due today (john-farrar-acc-incident-may-2026 — waiting on you: close H&S incident / confirm final leave handling) - 7 due this week - Managers waiting > 7d: Ben Knight (4 projects), Mark Bidlake (2…

    • Larry →Rohan Callander1d ago

      Morning brief — 9 Jun Projects: - 1 due today (john-farrar-acc-incident — awaiting your decision on H&S incident closure) - 7 due this week (disciplinary investigation due tomorrow + structure review, tool allowance setup, coffee shout, wo…

    • Larry →Rohan Callander2d ago

      *Weekly project digest — Week 23* *BWJ (4)* • `john-farrar-acc-incident-may-2026` · ACC Incident (12 May) · due 8 Jun · waiting Rohan — close H&S incident / confirm final leave handling • `john-farrar-disciplinary-investigation-may2026` ·…

    • Larry →Rohan Callander2d ago

      Morning brief — 8 Jun 2026 Projects: - 1 due today - 5 due this week - 0 blocked > 30d All six in-progress projects are awaiting manager/Rohan responses (Ben Knight × 3, Mark Bidlake × 1, Rohan × 1). No untracked DM commitments surfaced.

    • Larry →Rohan Callander2d ago

      Morning brief — Monday 8 Jun 2026 Projects: - 1 due today (john-farrar-acc-incident — waiting on you) - 5 due this week - 0 blocked > 30d **URGENT:** john-farrar-acc-incident due TODAY (8 Jun) — needs your closure note on H&S incident reg…

    • Larry →Rohan Callander2d ago

      On it. Before I set up the tracker, which type of process is this? *A — Routine performance/development review* Annual or periodic check-in: strengths, goals, development plan. No specific concerns to raise. (Pathway: Staff Assessment) *B…

    • Rohan Callander →Rohan Callander2d ago

      start a performance review for Ben

    • Larry →Rohan Callander2d ago

      The first step is *checking the employment agreement and any workplace policies* — these often set a specific process you must follow before doing anything else. After that, the general flow: • *Identify the issue early* — don't let under…

    • Rohan Callander →Rohan Callander2d ago

      what is first step in a performance review?

    • Rohan Callander →Rohan Callander3d ago

      i need leave

    • Larry →Rohan Callander3d ago

      "Leave request" — a few ways I can go here: 1. *Submit one* — who, what type, what dates? 2. *Show pending requests* — list of what's sitting unapproved? 3. *Check someone's balance* — who? What are you after?

    • Rohan Callander →Rohan Callander3d ago

      leave request

    • Larry →Rohan Callander3d ago

      _(Already replied above with the full description of the Brocklesby Kitchen 3 render — let me know if you need anything else on it.)_

    • Larry →Rohan Callander3d ago

      This is a 3D render of the Brocklesby kitchen design. Key details: *Layout* • L-shaped run along the back/left walls with a large island bench in the foreground • Looks like a generous open-plan space with good natural light from two windo…

    • Rohan Callander →Rohan Callander3d ago

      describe this

    • Larry →Rohan Callander3d ago

      Done — DM'd both Mark Bidlake and Andy Stanning letting them know lights are on the way (~20 June).

    • Larry →Andy Stanning3d ago

      Hey Andy — just to let you know, lights are on the way and should be with you by around 20 June. I'll follow up once they're in.